Welcome to edition 004 of Pipeline OS. Last week we covered the 15% MQL-to-SQL leak. This week, something smaller and more fixable: the connection note you've been writing for the wrong job.

Almost every B2B team obsesses over the connection note as the thing that gets them accepted. A 20 million attempt study says the note barely touches acceptance. It does something else entirely, and most people are not writing for it.

IN THIS ISSUE

→ Why the connection note barely changes acceptance

→ The metric it actually nearly doubles

→ 3 reads worth your time

→ Partner spotlight: scaling a team to deliver the pipeline you win

→ A prompt that rewrites a connection note for the reply, not the accept

→ The connection-message audit to run this week

Subscribe to keep reading

This content is free, but you must be subscribed to Pipeline OS to continue reading.

Already a subscriber?Sign in.Not now